KADENA MARINA, Japan (Jan. 30, 2009) Beat feet right after work and spent about an hour aboard Scarlette prepping the starboardside for net installation.
The process is tedious to say the least. I first had to string up a line across the bottom of the stanshions (the poles on the deck) that hold up the life lines.
Then I used small string like before to keep the net in place. I was able to get the entire net placed on the lifelines and had to leave. It was pretty wind but hoped that it would hold until I could get back again to at least start the full installation.
No comments:
Post a Comment